Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • US Updates

    Upcoming Oakley Road Bridge Replacement to Affect South Fulton Traffic for 120 Days

    2024-05-24
    https://img.particlenews.com/image.php?url=0BTXAU_0tMCq4iB00

    This article contains content summarized with GPT-4 Learn more. It is based on information from cityofsouthfultonga.gov, which reflects the perspectives and priorities of the organization. Please consider the specific interests of the source when reading

    The City of South Fulton has announced that the Oakley Road bridge over Broadanax Creek will be replaced. The Georgia Department of Transportation will oversee this project, starting on June 6, 2024. The bridge will be closed for about 120 days during construction.

    The current bridge, built in 1961 and spanning 30 feet, will be replaced with an 80-foot structure. The new bridge will include a 12-foot lane in each direction, 2-foot gutters, and 6.5-foot sidewalks on both sides. The project will cover an area of approximately 0.20 miles, aiming to improve access for both vehicles and pedestrians.

    Traffic will be redirected via Fayetteville Road and Oakley Industrial Boulevard during construction to reduce impact on local residents. Access to the Oakley Township subdivision and residences on Taloga Lane will remain open.

    The City of South Fulton is focused on minimizing inconvenience during the construction. Local authorities are seeking the community’s patience and cooperation during this period.

    Visit here for more details
    Expand All
    Comments /
    Add a Comment
    YOU MAY ALSO LIKE
    Local News newsLocal News
    The Current GA5 hours ago
    The Shenandoah (PA) Sentinel4 hours ago
    Robert Russell Shaneyfelt29 days ago
    Robert Russell Shaneyfelt22 days ago

    Comments / 0