Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Crime
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • Daily Energy Insider

    Georgia Power lands contract to provide efficient energy for Fort Eisenhower

    By Dave Kovaleski,

    19 days ago
    https://img.particlenews.com/image.php?url=17cGPP_0uDItbPw00

    Georgia Power has landed a $72 million utility energy service contract (UESC) from U.S. Army Garrison Fort Eisenhower to increase the energy efficiency of the 55,000-acre military installation located near Augusta, Ga.

    A UESC is a limited-source acquisition between a federal agency and a utility for energy management services to improve the overall efficiency of buildings and mechanical equipment at a location. The improvements are expected to reduce energy costs at Fort Eisenhower by $6 million annually. This is the largest such contract in Georgia Power’s history.

    The contract will leverage the utility’s knowledge of lighting systems, mechanical and controls systems, on-site generation and water conservation to reduce the carbon footprint by focusing on three key areas — energy efficiency, resiliency and greenhouse gas reduction.

    “We are extremely happy to be partnering with Georgia Power for this project,” Col. Reginald Evans, U.S. Army Garrison Eisenhower commander, said. “Replacing Fort Eisenhower’s aging diesel powered generators with natural gas systems is a huge step toward reducing the installation’s carbon footprint, in addition to the energy savings from the numerous other conservation measures planned.”

    The key improvement is the replacement of the diesel generation infrastructure with new natural gas generation. The upgraded generation will be funded through energy savings from lighting retrofits, heating and air conditioning replacement and water conservation.

    This investment is in addition to the broader contract with Georgia Power serving as the owner of Fort Eisenhower’s electric utility system.

    “We are grateful for this partnership with U.S. Army Garrison Fort Eisenhower as we work toward furthering the energy efficiency at the installation and lessening the carbon footprint,” Latanza Adjei, senior vice president and chief customer officer for Georgia Power, said. “Collaborative efforts such as this are essential for creating a sustainable energy future and align with our commitment to our customers and communities.”

    The expected completion date of the project is the first quarter of 2026.

    The post Georgia Power lands contract to provide efficient energy for Fort Eisenhower appeared first on Daily Energy Insider .

    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Local Georgia State newsLocal Georgia State
    Most Popular newsMost Popular

    Comments / 0