Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Crime
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • USA TODAY Sports Media Group

    Construction on Folsom Field’s new south end video board nearly complete

    By Jack Carlough,

    5 hours ago

    https://img.particlenews.com/image.php?url=231LIs_0uTGozFT00

    Well ahead of Colorado football’s 2024 season opener against the North Dakota State Bison, construction on Folsom Field’s new south-end video board appears nearly complete.

    Monday morning, CU athletic director Rick George posted a picture of the main video board and the underneath ribbon board being turned on together for the first time.

    The new south jumbotron measures 130 feet wide by 36 feet tall, over five times larger than the surface area of the old board. Underneath, the ribbon board extends from the top of section 203 to the top of 220.

    Construction of the new video board, which cost approximately $15 million, began early this year.

    Here’s what George posted on X (formerly Twitter) Monday morning:

    George later posted a picture of CU’s logo being attached to the outside of the video board. Two smaller screens on the board’s outside-facing side are also seen as installed:

    Contact/Follow us @BuffaloesWire on X (Twitter), and like our page on Facebook for ongoing coverage of Colorado news, notes and opinions.

    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0