Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Crime
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • Breckenridge American

    Preventative maintenance underway on Mile Long Bridge

    By News Staff,

    2024-06-11

    Preventative maintenance underway on Mile Long Bridge News Staff Tue, 06/11/2024 - 3:37 pm The US 180 Bridge, better known locally as the “Mile Long Bridge” will experience nightly lane closures as preventative maintenance work is done on the bridge. The work is expected to be completed by late August. File photo By Mike Williams news@breckenridgeamerican.com The US-180 bridge over Hubbard Creek Lake will experience nightly lane closures as crews perform preventative maintenance on the bridge. Last week, a Texas Department of Transportation contractor began cleaning and sealing the joints on the US-180 bridge, known locally as the Mile Long Bridge. According to a release, this is a preventative maintenance job to extend the bridge’s life. During working hours, traffic across the bridge will be reduced to one lane with a traffic control device installed to guide traffic flow. The TxDOT release states that weather permitting, crews will work at night to minimize traffic delays. Motorists should expect delays during work hours and are asked to use caution when driving through the work zone, follow all signs and avoid distractions. Work is expected to be complete by the end of August. News Log in to post comments

    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0