Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Crime
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • KTSM

    TxDOT road closures for week of July 21, 2024

    By Luisa Barrios,

    1 day ago

    https://img.particlenews.com/image.php?url=0vgvIL_0uXo1Thj00

    EL PASO, Texas ( KTSM ) – The Texas Department of Transportation (TxDOT) El Paso has released a list of road closures for July 21, which could affect your commute.

    I-10 Widening West

    Monday, July 22, through Saturday, July 27 from 9 a.m. to 4 p.m.

    • I-10 will be reduced to one lane between Vinton Road and Transmountain Road.

    Crews will be constructing retaining walls.

    Monday, July 22, through Wednesday, July 24 from 9 a.m. to 4 p.m.

    • I-10 East will be reduced to one lane between Redd Road and North Mesa Street.

    Crews will be widening the shoulder.

    Tuesday, July 23 from 9 a.m. to 4 p.m.

    • Exit 6A (Loop 375/Spur 16/Transmountain Road) from I-10 West will be closed.

    DETOUR: Take Exit 8 (SH 178 /Artcraft Road/Paseo del Norte), continue on North Desert Boulevard.

    Crews will be working on the foundation for an overhead sign bridge.

    Thursday, July 25, through Saturday, July 27 from 9 a.m. to 4 p.m.

    • I-10 West will be reduced to one lane between North Mesa Street and Redd Road.

    Crews will be widening the shoulder.

    Guardrail Repair

    Monday, July 22 from 9 a.m. to 4 p.m.

    • Gateway West between Chelsea and Raynolds left lane and on-ramp closed at Raynolds.

    Tuesday, July 23 from 9 a.m. to 4 p.m.

    • North Desert eastbound between West Frontage Road and Antonio right lane closed.

    Crews will be working on guardrail.

    US-62 Rehabilitation Project

    Sunday, July 21 through Friday, July 26 from 9 p.m. to 6 a.m. (Nightly)

    • Montana Avenue (US-62) westbound and eastbound right and middle lane closures Global Reach Drive/Yarbrough Drive to McRea Boulevard.

    Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential/business access locations may be temporarily shifted due to milling/paving activities.

    Delta/Alameda & Zaragoza/George Dieter Traffic Signal Improvement Project

    Monday, July 22 through Friday, July 26 from 7 a.m. to 7 p.m.

    • Zaragoza and George Dieter intersection alternate lane closures.
    • Alameda north- and southbound at Delta intersection alternate lane closures.

    Crews will be working on traffic signals.

    Green Ribbon Project

    Monday, July 22 through Friday, July 26 from 9 a.m. to 4 p.m.

    • Montana east- and westbound between Airway and Killarney left lane closed.
    • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed.

    Crews will be working on median improvements.

    Mill/Inlay From SH-20 (Alameda) to Global Reach

    Monday, July 22 through Friday, July 26 from 9 a.m. to 4 p.m.

    • Montana east- and westbound between Paisano and Yarbrough alternate lane closures.

    Crews will be milling and paving.

    Sunday, July 21 through Friday, July 26 from 8 p.m. to 6 a.m. (Nightly)

    • Montana (US-62) East and Westbound alternate lane closures between Global Reach and McRae Boulevard intersection.

    Crews will be milling and paving.

    Maintenance

    Monday, July 22 through Friday, July 26 from 9 a.m. to 3 p.m.

    • Spur 601 east- and westbound between Chaffee and Loop 375 lane closed.

    Crews will be working on shoulder.

    Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.

    Montana Frontage Road Project

    Monday, July 8 through Saturday, July 27. Daily, from 9 a.m. to 5 p.m.

    • Montana Avenue (US 62/180) eastbound frontage road left lane closure between Dominican Street to Leticia Street.

    Crews will be exporting material.

    Monday, July 18 through Saturday, August 3

    Continuous closure until further notice.

    • Alba Lane full closure access to Montana Avenue (US 62/180).
    • Smoke Signal full closure access to Montana Avenue (US 62/180).

    Crews will be working on concrete pavement at intersections.

    Purple Heart Loop 375 Widening

    Monday, July 15 through Friday, August 9. Daily, from 9 a.m. to 3:30 p.m.

    • Purple Heart Highway (SL 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601.

    Crews will be working on placing asphalt in the median.

    Continuous closure until further notice

    • Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601.

    Crews will be widening main lanes and constructing north- and southbound frontage road.

    Loop 375 Widening Project

    Monday, July 22 through Thursday, July 25. Nightly, 9 p.m. until 5 a.m.

    • Americas Highway (SL 375) south- and northbound main lane closure between North Loop Bridge Overpass and Zaragoza (P.O.E) Bridge Overpass.
    • Americas Avenue (frontage road) North Loop Road underpass at intersection with full closure.

    Crews will be working on installing bridge and roadway structures.

    SH 20 Raised Medians Project

    Saturday, July 21 through Sunday, July 27. Daily, 8 a.m. to 4 p.m.

    • SH 20 (Alameda Avenue) east- and westbound inside lane closures between Rio Vista Boulevard and Passmore Road.

    Crews will be installing concrete medians and finishing electrical conduits.

    SL 375 Mill and Inlay Project

    Sunday, July 21 through Thursday, July 25. Nightly, 9 p.m. to 6 a.m.

    • SL 375 (Joe Battle Boulevard) north- and southbound alternating right and left lane closures between Pellicano Drive and Montana Avenue.

    Crews will be performing milling operations, base repairs and placing hot mix asphalt.

    IH10 Widening East

    Monday, July 22 through Friday, July 26. Daily from 9 a.m. to 3:30 p.m.

    • IH10 east alternating left and right shoulder closures between Eastlake Boulevard and Horizon Boulevard.
    • Gateway east alternating left and right shoulder closures between Eastlake Boulevard and Horizon Boulevard.

    Daily, from 9 a.m. to 4 p.m.

    • IH10 west alternating left and right shoulder closure between Eastlake Boulevard and Horizon Boulevard.
    • Gateway west alternating left and right lane closures between Eastlake Boulevard and Horizon Boulevard.

    Crews will be working on replacing signs and repairing guardrail.

    Closure links:

    Copyright 2024 Nexstar Media Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

    For the latest news, weather, sports, and streaming video, head to KTSM 9 News.

    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0