Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • KXRM

    Nighttime southbound I-25 temporary closures scheduled

    By Dara Korn,

    1 days ago

    https://img.particlenews.com/image.php?url=2Mp6Bm_0voETlQa00

    (COLORADO SPRINGS) — The Colorado Department of Transportation (CDOT) reported that crews will temporarily close southbound I-25 at South Academy Boulevard for several nights during the week of Sunday, Sept. 29, as part of a traffic switch for the Military Access, Mobility & Safety Improvement Project ( MAMSIP ).

    • https://img.particlenews.com/image.php?url=2rAP8r_0voETlQa00
    • https://img.particlenews.com/image.php?url=0usKDA_0voETlQa00
    • https://img.particlenews.com/image.php?url=2js71M_0voETlQa00
    • https://img.particlenews.com/image.php?url=3QnO9r_0voETlQa00
    • https://img.particlenews.com/image.php?url=0AsSwC_0voETlQa00

    Improvements include removing barriers, installing signage, and completing drainage work along southbound I-25 during nighttime hours from Tuesday, Oct. 1, to Friday, Oct. 4.

    Closures include:

    • Temporary full closure of southbound I-25 between South Academy Boulevard and Santa Fe Avenue.
    • Temporary full closures of southbound I-25 between South Academy Boulevard and Mesa Ridge Parkway.
    • Rerouting of northbound I-25 traffic using the South Academy Boulevard ramps.
    • Temporary nighttime closures of South Academy Boulevard lanes under I-25 from Monday to Friday, Sept. 30 through Oct. 4, for electrical conduit and lighting installation under the I-25 bridge deck.
    • Left lane closure on southbound I-25 between South Academy Boulevard and Mesa Ridge Parkway on Monday, Sept. 30, from 7 p.m. to 6 a.m. for safety barrier removal.
    • Right lane closure on southbound I-25 at Santa Fe Avenue on Tuesday, Oct. 1, from 1 to 3 p.m. for concrete sign footer installation.

    A closure of northbound South Academy Boulevard between I-25 and U.S. 85 is planned for Sunday, Sept. 29, midnight to Monday, Sept. 30, at 4:30 a.m., and Friday, Oct. 4, at 7 p.m. to Monday, Oct. 7, at 4:30 a.m., for Fountain Creek bridge work.

    The speed limit in this area has been reduced to 60 mph. Motorists should expect delays of 10-15 minutes and are urged to use extra caution while traveling through the construction zone, where fines will be doubled.

    Copyright 2024 Nexstar Media Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

    For the latest news, weather, sports, and streaming video, head to FOX21 News Colorado.

    Expand All
    Comments /
    Add a Comment
    YOU MAY ALSO LIKE
    Local News newsLocal News

    Comments / 0