Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Crime
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • The Baltimore Sun

    Manchester plans nine street rehab projects

    By Thomas Goodwin Smith, Baltimore Sun,

    1 day ago

    Manchester has planned street repairs on nine roads, including upgrades to the Manchester Town Hall front parking lot and the Manchester Post Office rear lot, according to town meeting documents.

    Manchester has also planned a 2-inch mill and asphalt overlay for seven town roads.

    Victory Street, Hilltop Drive, about 750 feet of Brightside Drive, a portion of Maiden Lane beginning at Beaver Street, the portion of Washington Way between Bert Fowler Road and Ridgeleigh Court, a portion of Southwestern Avenue beginning at Charmil Drive, and the portion of Bachman Road between Sutton Court and Holland Drive, are each due for a 2-inch mill and overlay, or repaving.

    The post office parking lot and portion of Bachman Road also require a full depth patch, according to town documents. which means potholes or significant cracks will be repaired.

    The town will notify residents and handle no-parking signage as required. Contractors will handle road markings, and each project will be inspected by the town.

    Road work will occur between 7:30 a.m. and 5 p.m. All projects should be complete by Nov. 22, according to town documents.

    Manchester will accept bids to complete the projects until Aug. 8, after which time the cost of each project will become clear.

    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0