Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • MyArkLaMiss

    ROAD STATUS: US 80 in Lincoln Parish to undergo construction starting April 15th

    By Jalon Grant,

    2024-04-11
    https://img.particlenews.com/image.php?url=20IdVS_0sNpJ4Zr00

    LINCOLN PARISH, La. (KTVE/KARD) — The Louisiana Department of Transportation and Development advises drivers starting Monday, April 15, 2024, there will be ongoing construction along US 80 in Lincoln Parish from Walker Road to the Ouachita Parish line.

    The work will involve tree trimming, asphalt patching, cross drain replacement, and asphalt overlay. Those traveling can expect daily lane closures, through traffic will be maintained at all times, this work will be done weather permitting. There will be no alternate route.

    DOTD appreciates your patience and reminds you to drive cautiously through the construction site and be on the lookout for work crews and their equipment.

    Area residents should be cautious when driving, walking, or biking near an active work zone.

    For more information, visit www.dotd.la.gov or contact (318) 251-4117.

    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0