Lyten (San Jose, Calif.) announced plans to invest more than $1 billion to build what is said to be the world’s first Lithium-Sulfur battery gigafactory. The facility will be located near Reno, Nevada, and will have the capability to produce up to 10 GWh of batteries annually at full scale. Phase 1 of the facility is scheduled to come online in 2027. Lyten’s factory will manufacture cathode active materials (CAM) and lithium metal anodes and complete assembly of lithium-sulfur battery cells in both cylindrical and pouch formats. Lyten has been manufacturing CAM and lithium metal anodes and assembling batteries at its semi-automated pilot facility in San Jose, Calif., since May 2023.