Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Crime
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • Florence Independent

    Intermittent daytime lane restrictions on US60 east of Superior begin May 6

    2024-04-27

    https://img.particlenews.com/image.php?url=2oKDHI_0sg4X7jR00

    The Arizona Department of Transportation advises drivers to plan for frequent intermittent daytime lane restrictions lasting approximately 15 minutes on US60 east of Superior, between milepost 227-231, for construction activities as the US60, Queen Creek and Waterfall Canyon Bridges Replacement Project begins.

    Drivers should prepared for:

    • Onsite flaggers and a pilot car to direct drivers through the work zone.
    • A 14-foot vehicle width restriction to be in place. Oversize loads may be accommodated with advance notice.
    • The speed limit will be reduced in the work zone.

    Starting May 15, full closures of US60 will begin between Superior and Miami 9 a.m.-2 p.m. Tuesdays, Wednesdays and Thursdays for rock blasting. During the full closures of US60, traffic will be detoured on state routes 77 and 177. Due to the roughly 75-mile length of this detour, drivers may want to consider planning travel before 9 a.m. and after 2 p.m.

    For more information about this project and to sign up for notifications about this project, go to azdot.gov/US60QueenCreekBridgeProject .

    Drivers should allow extra travel time and be prepared to slow down, use caution and merge safely when approaching and traveling through highway work zones.

    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0