Willow River
Politics
🚧 Construction Update: Roadworks on MN 45 Near Exit 242, Carlton County
The time displayed is local to the original 511 traffic site in Minnesota. A report sourced from the Waze navigation app, and generated within the 511MN system, indicates that there is road construction taking place between MN 45 and Exit 242, specifically around Carlton County Road 1, approximately 1 mile north of Scanlon, Esko area. Please note that while this information has been relayed via 511MN, the Minnesota Department of Transportation (MnDOT) has expressed that it cannot verify the accuracy of reports coming from third-party apps such as Waze. Motorists in the area are advised to remain vigilant for potential changes to road conditions and may wish to plan their routes accordingly to avoid unexpected delays. The location of this construction is near Blue Star Memorial Highway/34th Infantry (Red Bull) Division Highway, Thomson Township, MN 55733, United States of America.
NESC expanding region's broadband
MOUNTAIN IRON—Ground was broken Tuesday morning and construction will soon be underway to expand broadband in the region. The $4.25 million project will add 136 route miles in three counties, expanding the Northeast Service Cooperative’s total network by 11% for a total of 1,366 miles. “We’re in the super highway business (of fiber networks). So we’re going to run that highway and make sure there’s lots of off ramps that’s...
🚧 Construction Update for Willow River Area on Blue Star Memorial Highway
The time displayed is local to the original 511 traffic site in Minnesota. Travelers on the Blue Star Memorial Highway near Willow River should anticipate construction-related delays between Exit 205 at Pine County Road 43 and Exit 195, about 3 miles south of Willow River. This construction update has been reported by a Waze user and was subsequently shared by 511MN. However, it is important to note that the accuracy of this report, generated through the Waze navigation app, has not been independently verified by the Minnesota Department of Transportation (MnDOT). Motorists are advised to consider possible delays in their travel plans or seek alternate routes. The exact times of the construction activities have not been specified, and drivers are encouraged to exercise caution when traveling through the affected segments of the highway.
🚧 Road Construction Update on Blue Star Memorial Hwy between Exits 220 and 227
The time displayed is local to the original 511 traffic site in Minnesota. Travelers should be advised of reported road construction occurring on Blue Star Memorial Highway/34th Infantry (Red Bull) Division Highway between Exit 220 at Carlton County Road 6 near Barnum and Exit 227 at Carlton County Road 4 in Mahtowa Township. The report has been generated via the 511MN system from data provided by the Waze navigation app. The Minnesota Department of Transportation (MnDOT) has not independently verified the accuracy of this information. Motorists in the area should remain alert for potential disruptions and plan their routes accordingly.
Richard Grand Wildlife Project fined
According to a Minnesota Pollution Control Agency (MPCA) enforcement investigation, the Richard Grand Wildlife Project began construction in October 2022 without a stormwater permit or a stormwater pollution prevention plan. The project also failed to control erosion and sediment runoff at a pond and wetland improvement site near Finlayson. As a result, the project fined $19,641 for the violations. ...
🚧 Update on Road Construction Between Exits 214 and 209 Near Willow River, MN
The time displayed is local to the original 511 traffic site in Minnesota. Travelers heading through Willow River, Minnesota should be aware of recent road construction activities occurring between Exit 214 and Exit 209 along Pine County Road 46, approximately 4 miles north of Willow River. This report is based on information obtained from Waze users and has been shared through the MnDOT's 511MN service. While the Minnesota Department of Transportation (MnDOT) has made this information available, they have noted that they are unable to verify the accuracy of the data at this time. Commuters are advised to exercise caution when navigating this stretch of road and to plan for potential delays as a result of the construction work. Please stay tuned for further updates as they become available.
🚧 Construction Update: Roadwork Between Exits 195 and 205 on Pine County Road 43 Near Willow River, MN
The time displayed is local to the original 511 traffic site in Minnesota. A recent report sourced from Waze users indicates that there is ongoing road construction occurring between Exit 195 and Exit 205, along Pine County Road 43, approximately 4 miles south of Willow River, MN. This construction event is currently listed in the latest update within the 511MN system; however, the Minnesota Department of Transportation (MnDOT) has noted that they cannot guarantee the accuracy of this report. Motorists planning to travel through the Blue Star Memorial Highway/34th Infantry (Red Bull) Division Highway in the Finlayson Township area should expect potential delays and may want to consider alternate routes or allow additional travel time to navigate through or around the construction zone.
It’s essential to note our commitment to transparency:
Our Terms of Use acknowledge that our services may not always be error-free, and our Community Standards emphasize our discretion in enforcing policies. As a platform hosting over 100,000 pieces of content published daily, we cannot pre-vet content, but we strive to foster a dynamic environment for free expression and robust discourse through safety guardrails of human and AI moderation.