Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • Traffic Information

    🚧 Upcoming Resurfacing Project on MO 3 from Adair to Randolph County Starts April 1

    2024-03-13
    https://img.particlenews.com/image.php?url=0AFm7d_0rrCXStS00

    The time displayed is local to the original X account in Hannibal, Missouri.

    A significant resurfacing project is scheduled to commence on April 1, weather permitting, along 52 miles of MO 3. The stretch from MO 11 in Adair County to U.S. 24 at Clifton Hill in Randolph County will undergo maintenance for an improved driving experience. Community members and commuters are urged to exercise caution and stay alert for crews performing the resurfacing. Traffic signs will be placed as a guide to ensure the safety of both the crews and drivers. For more details on the resurfacing project, please refer to the information provided through the following link: https://t.co/waIFQapEQ3

    This content was assisted by AI. Please verify critical information with trusted sources. Learn more.

    Expand All
    Comments /
    Add a Comment
    YOU MAY ALSO LIKE
    Local News newsLocal News
    Mississippi News Group4 days ago
    The Current GA56 minutes ago
    Robert Russell Shaneyfelt29 days ago
    Robert Russell Shaneyfelt22 days ago

    Comments / 0