Open in App
  • Local
  • Headlines
  • Election
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • Traffic Information

    🚧 Update: Bridge Work on NY 9N at US 9 in Elizabethtown to Cause Alternating Lane Closures

    2024-04-10
    https://img.particlenews.com/image.php?url=40WR0w_0sM0MsNe00

    The time displayed is local to the original 511 traffic site in NewYork.

    In an effort to ensure safe and efficient travel for commuters, the New York State Department of Transportation (NYSDOT) has announced ongoing bridge work on NY 9N in both directions at the intersection with US 9 near Water Street. The construction, located at the bridge over Bouquet River in Elizabethtown, will result in alternating lane closures controlled by traffic signals to accommodate travelers while the work is being carried out. The bridge work is scheduled to continue every weekday, starting from Wednesday, April 10th, 2024 at 12:00 AM through Friday, October 18th, 2024 at 11:59 PM. Work crews will be actively on-site from 7 AM until 3:30 PM, Monday through Friday. Drivers are advised to plan their travels accordingly and expect minor delays due to the alternating traffic patterns. All lanes will remain open outside of the mentioned crew hours to minimize impact on traffic. Residents and commuters are encouraged to stay informed on this project and its progress.
    This article includes content summarized and organized by AI tools. Learn more.
    Expand All
    Comments /
    Add a Comment
    YOU MAY ALSO LIKE
    Local News newsLocal News
    Robert Russell Shaneyfelt27 days ago
    Robert Russell Shaneyfelt12 days ago
    Alameda Post22 days ago

    Comments / 0