Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • Traffic Information

    🚧 Paving Work Scheduled on I-25 South of Colorado City, CO - Lanes Closure Update

    2024-04-12
    https://img.particlenews.com/image.php?url=03xOo8_0sOJbloQ00

    The time displayed is local to the original 511 traffic site in Colorado.

    Local motorists are advised of upcoming paving operations on Interstate 25 between Exit 64: Lascar Road and Exit 71: Graneros Road, approximately 3 to 8 miles south of Colorado City. The right lane will be closed to facilitate these operations, impacting travel from Mile Point 64 to Mile Point 68.85. The lane closure is scheduled to begin tomorrow at 7:00 AM MDT and is expected to conclude the same day, around 7:00 PM MDT. Drivers planning to travel through this section of I-25 should anticipate potential delays and consider alternate routes if necessary. Please remain alert for construction crews and equipment in the area during these hours. Here is the complete schedule for the planned paving: • April 12, 7:00 AM - April 12, 7:00 PM.
    This article includes content summarized and organized by AI tools. Learn more.
    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0