Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • Traffic Information

    🚧 Update: Construction Completed on Rip Van Winkle Bridge, All Lanes Open

    2024-05-02
    https://img.particlenews.com/image.php?url=00iUdU_0slaXR2M00

    The time displayed is local to the original 511 traffic site in NewYork.

    The local transportation department has announced that the construction activities on the Rip Van Winkle Bridge, which connects Greene County to Columbia County, have now concluded. The bridge, which was under construction affecting both directions, is now fully operable with all lanes opened for traffic. Commuters traveling between the counties of Greene and Columbia can expect a return to normal traffic flow on the bridge. This update serves as a notice to residents and travelers in the region that the bridge is now accessible without any construction-related restrictions or delays.
    This article includes content summarized and organized by AI tools. Learn more.
    Expand All
    Comments /
    Add a Comment
    YOU MAY ALSO LIKE
    Local News newsLocal News
    The Shenandoah (PA) Sentinel4 days ago

    Comments / 0