Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Crime
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • White Center Blog

    PHOTOS: Highline School Board members see progress at tour of new Evergreen High site

    2024-03-28
    https://img.particlenews.com/image.php?url=2hX5X8_0s8IShqP00

    On March 15 and 26, 2024, Highline School Board members toured the Evergreen High School construction site in White Center to get a first-hand view from the third floor.

    Rep. Tina Orwall, district and school leaders, and several alumni walked through also.

    They seemed delighted with 14 months of progress, new features and the warmth of the three-story, mass-timber section of the school.

    Highline Public Schools said that the new school should be ready for occupancy in August, 2025.

    “We expect the new school to be ready for occupancy in August 2025,” the district said.

    Following a move to the new building, the old buildings will be demolished, and new baseball and softball fields will be completed by August, 2026.

    “We expect the approved building permit to be issued by King County in late March or early April.”

    https://img.particlenews.com/image.php?url=0Ex3D9_0s8IShqP00
    In this photo, School Board Member Stephanie Tidholm (left) and her son walk down a hallway in the classroom building, along with former board member Aaron Garcia (right).

    “It is so majestic already,” said Board Member Stephanie Tidholm. “I can only imagine how beautiful the finished building will be. My mother graduated from Evergreen, so to see the new school go up and know my littlest will be going there is so exciting.”

    “Better than I could have imagined!” was the happy verdict from Long Phan, Evergreen alum and a leader in the non-profit organizations Yes for Highline and Friends of Evergreen.

    https://img.particlenews.com/image.php?url=2jVlYP_0s8IShqP00
    School board members Stephanie Tidholm and Joe Van walked the site, along with Scott Logan, chief of operations; Teshon Christie, chief of digital transformation & innovation; and Catherine Carbone Rogers, chief of communications. In addition to Long Phan, alumni included former school board member Aaron Garcia who is now executive director of the White Center Community Development Association.

    The group walked through what will be the library in the activities building, and toured the classroom building. They climbed stairs to the third floor for panoramic views of the existing school, the synthetic turf athletic field, Cascade Middle School, and the Dick Thurnau Memorial Park with its lake full of ducks.

    https://img.particlenews.com/image.php?url=3xWRlM_0s8IShqP00
    View from future Evergreen High School library looking northwest toward the gym (left) and the classroom building (right).
    https://img.particlenews.com/image.php?url=3r6XRG_0s8IShqP00
    Looking west, the space between the two main buildings will feature one of three student courtyards, which are intended to reflect the many outdoor gathering spaces of the current Evergreen. This courtyard has a large “learning stairway” for outdoor learning and socializing.
    https://img.particlenews.com/image.php?url=2jNaJE_0s8IShqP00
    The steel beams are in place for the skybridge that will connect the two-story activities building (left) to the three-story classroom building (right).  The skybridge will be enclosed in glass.
    https://img.particlenews.com/image.php?url=2yYdUM_0s8IShqP00
    View of a stairway in the classroom building.
    https://img.particlenews.com/image.php?url=47ggie_0s8IShqP00
    Here’s a look at the massive vaulted ceilings in the three-story classroom building of the new Evergreen High School. This hallway will include classrooms on both sides, along with a digital arts & photography studio, green screen room and learning commons.

    Representatives of Bassetti Architects, Cornerstone GCI, and Vanir Construction Management helped lead the tour, along with Ellie Daneshnia, executive director of Highline’s Capital Planning & Construction team.

    https://img.particlenews.com/image.php?url=1pd5mf_0s8IShqP00
    View from the classroom building looking towards the track and synthetic turf football/soccer practice field.
    https://img.particlenews.com/image.php?url=0GSGwN_0s8IShqP00
    Looking north from the third floor of of new Evergreen High School.
    https://img.particlenews.com/image.php?url=2SslTH_0s8IShqP00
    A 10-foot by 118-foot truss weighing 30,000 pounds is hoisted into place with a crane. The final pieces of steel will be installed in April.
    https://img.particlenews.com/image.php?url=1u70D2_0s8IShqP00
    “It was especially cool to see the ‘test’ building and hear that it will be kept as a garden shed rather than torn down as is usually done.” –Board Member Stephanie Tidholm.
    https://img.particlenews.com/image.php?url=1MieL5_0s8IShqP00

    SCHEDULE & BUDGET STATUS

    Highline Public Schools said that the Evergreen High School replacement project is on schedule and within budget.

    Photos courtesy Highline Public Schools.

    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0