Open in App
  • Local
  • Headlines
  • Election
  • Crime Map
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • WHNT News 19

    Redstone Arsenal gate to be closed for road work two separate weekends

    By Rebecca Teutsch,

    24 days ago

    https://img.particlenews.com/image.php?url=1lBAJX_0vjHoBWX00

    REDSTONE ARSENAL, Ala. ( WHNT ) — Team Redstone announced Gate 8 will close for road work two times in the next few weeks.

    Team Redstone posted on Facebook that Gate 8 would be closed for the first time from Thursday, September 26 through Monday, September 30. The second time Gate 8 will be closed is Thursday, October 3 through Monday, October 7.

    City of Athens installs cameras on garbage trucks

    Roadway surfaces will be milled during the first closure and will then be paved during the second. gate 8 will close at 9:30 a.m. on closure dates and will reopen at 10 a.m. on reopening dates.

    Team Redstone said vehicles will be able to drive on the milled roads.

    Gate 10 on Patton Road South will be open for entry while Gate 8 is closed. Gate 10 will be open for entry and exit between 5:30 a.m. through 9:30 p.m. during both Gate 8 closures.

    Copyright 2024 Nexstar Media Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

    For the latest news, weather, sports, and streaming video, head to WHNT.com.

    Comments /
    Add a Comment
    YOU MAY ALSO LIKE
    Local News newsLocal News
    WHNT News 199 hours ago

    Comments / 0