Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • WJTV 12

    I-55 bridge work expected to cause delays for Jackson drivers

    By Malaysia McCoy,

    2 days ago

    https://img.particlenews.com/image.php?url=1B2qHE_0vrhGwQE00

    JACKSON, Miss. ( WJTV ) – Officials announced the Mississippi Department of Transportation (MDOT) will soon begin a critical hydro-demolition project on the north and southbound I-55 bridges over the Pearl River in Jackson.

    “Over time, the high volume of traffic has caused these bridge decks to deteriorate. That is why once the Mississippi State Fair wraps up, we’re going to remove and replace the bridge decks on I-55 over the Pearl River in Jackson to extend the life of these bridges,” said MDOT Executive Director Brad White. “We want to inform local drivers that utilize this stretch of interstate regularly about these lane closures so they may begin planning alternate routes to avoid potential congestion.”

    JXN Food & Wine Festival expands to two days in 2025

    According to MDOT, the work will require two lanes to be shut down at a time, leaving two travel lanes open in each direction. Crews will begin by closing the inside lanes first before swapping to the outside lanes.

    Although both directions of I-55 will remain passable, these lane closures will have a major impact on traffic. To limit congestion, especially during peak travel, MDOT advised drivers to utilize these alternate routes when possible:

    • I-220 for I-55 through traffic
    • SR 468 to SR 25
    • SR 475 to SR 25

    Construction activities are expected to begin the evening of Tuesday, October 15, with traffic reduced to two lanes in each direction soon after. MDOT will inform the public of the closure dates once determined.

    https://img.particlenews.com/image.php?url=1FMkkw_0vrhGwQE00
    MDOT will soon begin a critical hydro-demolition project on the north and southbound I-55 bridges over the Pearl River in Jackson. (Courtesy: MDOT)

    Crews estimate the closures will be in place for the remainder of 2024, which will include hydro-demolition and new deck installation on the inside lanes in each direction before swapping to the outer lanes. Once work begins, message boards will be in place to alert drivers of the lane closures.

    The $24.4 million contract was awarded to Key, LLC of Madison.

    Close

    Thanks for signing up!

    Watch for us in your inbox.

    Daily News

    Copyright 2024 Nexstar Media Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

    For the latest news, weather, sports, and streaming video, head to WJTV.

    Expand All
    Comments / 1
    Add a Comment
    Donnie H
    2d ago
    How about restoring Interstate lights on I-20 I-220
    View all comments
    YOU MAY ALSO LIKE
    Local News newsLocal News
    Robert Russell Shaneyfelt18 hours ago
    The Shenandoah (PA) Sentinel17 days ago

    Comments / 0