Open in App
  • Local
  • Headlines
  • Election
  • Crime Map
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • WOOD TV8

    Massive project planned for GR would create downtown’s tallest building

    By Madalyn Buursma,

    16 hours ago

    https://img.particlenews.com/image.php?url=10dvZG_0w9Zlt0c00

    GRAND RAPIDS, Mich. (WOOD) — The transformational brownfield plan for a major three-building project planned for downtown Grand Rapids was approved Wednesday.

    The project is planned for more than 6 acres along the Grand River at Fulton Street and Market Avenue, including the site of Charley’s Crab. The $800 million project includes three high-rise buildings.

    The Grand Rapids Brownfield Redevelopment Authority approved the plan, which includes around $32 million in local property tax capture, a performance-based incentive.

    Plan for old Charley’s Crab site would be ‘skyline-defining,’ firm says
    https://img.particlenews.com/image.php?url=0jUzY7_0w9Zlt0c00
    A rendering of a proposed development along the Grand River in Grand Rapids. (Courtesy)

    According to planning documents, the massive project would include a 21-story office tower along US-131 that would be built on top of a parking podium. It would have around 916,000 square feet, with eight floors of parking and 13 floors of office space, which will be mostly occupied by one tenant. Construction on that building is expected to start in the fall of 2025, with the goal of completing it in the fall of 2027.

    There would also be a residential tour with almost 600 apartments. The apartments would be aimed at those making around 150% of the area median income, with rates set between $2,643 and $3,928.

    It would be 43 stories tall, making it the tallest building in downtown. Currently, the tallest is the River House at Bridgewater Place, according to Wolverine Building Group . That building is 34 stories tall.

    https://img.particlenews.com/image.php?url=0NGVAe_0w9Zlt0c00
    The old Charley’s Crab site in along the Grand River in Grand Rapids. (Sept. 19, 2024)

    It would be built on top of a second parking structure. The 27-story hotel and condo tower would also be built on the second parking structure, with 76 condos and 130 hotel rooms.

    There would be just over 2,500 parking spaces between the two parking structures. Built alongside the parking podiums would be retail space, with a total of 37,800 square feet of retail space.

    Inside WOODTV.com: Building West Michigan

    Crews are expected to start construction on both of those buildings in the summer of 2026, with a completion goal of the summer of 2029.

    On Nov. 12, the Grand Rapids City Commission will hold a public hearing to consider approving the Transformational Brownfield Plan, along with an affordable housing agreement.

    With contributions from renting out apartments and selling the condos, the development is expected to contribute about $8.5 million to Grand Rapids’ affordable housing fund over 20 years. Project organizers say that funding would be enough to support 85 affordable units.

    In February 2025, project organizers hope to go before the Michigan Strategic Fund Board to request state incentives.

    Copyright 2024 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

    For the latest news, weather, sports, and streaming video, head to WOODTV.com.

    Comments /
    Add a Comment
    YOU MAY ALSO LIKE
    Local News newsLocal News
    WOOD TV815 hours ago
    WOOD TV81 day ago

    Comments / 0