Open in App
  • Local
  • Headlines
  • Election
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • WPRI 12 News

    Route 37 ramp closed this weekend for bridge work

    By Shaun Towne,

    2024-09-05

    CRANSTON, R.I. (WPRI) — The ramp that connects Route 37 West to I-295 North will be closed this weekend so the Rhode Island Department of Transportation (RIDOT) can replace another bridge.

    The work, which is weather dependent, is scheduled to begin at 8 p.m. on Friday, Sept. 6, and end by 5 a.m. on Monday, Sept. 9, according to RIDOT.

    During that time, drivers will be directed to remain on Route 37 until Natick Avenue, where they’ll loop around to the eastbound side before getting onto I-295.

    Those using the ramp from I-295 South will have to come to a full stop before merging onto Route 37, RIDOT added.

    WATCH: RIDOT demolishes, replaces Route 37 bridge

    Over the course of the weekend, RIDOT will be conducting a rapid replacement of the bridge that carries the ramp over the Washington Secondary Bike Path, which will also be briefly detoured.

    The work is part of the $85 million Cranston Canyon Project. RIDOT is repairing and replacing bridges along Route 37 and I-295 to improve safety and reduce congestion.

    https://img.particlenews.com/image.php?url=3HiNUh_0vM0jgp200
    Detour for Route 37 West to I-295 North ramp closure (Courtesy: RIDOT)
    Close

    Thanks for signing up!

    Watch for us in your inbox.

    Ocean, Bay & Beach Report

    Copyright 2024 Nexstar Media Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

    For the latest news, weather, sports, and streaming video, head to WPRI.com.

    Expand All
    Comments /
    Add a Comment
    YOU MAY ALSO LIKE
    Local News newsLocal News
    The Shenandoah (PA) Sentinel12 hours ago
    The Shenandoah (PA) Sentinel21 days ago
    The Current GA2 days ago

    Comments / 0