Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • AI Summarized - US Updates

    Salina Road Maintenance Alert: Pavement Sealing Scheduled for May 8-10

    2024-05-06
    https://img.particlenews.com/image.php?url=4V9ooq_0sqDcGca00

    Title: Pavement Sealing Work Continues

    From May 8th to 10th, Circle C Paving & Construction, located in Goddard, Kansas, will continue the City of Salina's annual pavement crack sealing project. The work will cover various streets including parts of 5th Street, Applewood, Aullwood, Beechwood, Brookwood, Georgetown, and Stewart Village. The maintenance will take place daily from 8 a.m. to 5 p.m., weather permitting.

    The goal of the project is to enhance road safety and extend the lifespan of the roads by sealing cracks. This helps prevent water from entering the pavement, which can cause further damage like crack widening, voids, and potholes. Sealing these cracks is essential for maintaining the roads' condition.

    During the work, access to properties in the affected areas will be kept open, but there may be temporary single-lane closures and visible 'Road Work Ahead' signs. These are necessary to protect both the workers and drivers. Motorists are urged to be cautious and patient when passing through these areas.

    The crack sealing is part of Salina’s wider street maintenance plan, which includes various repairs and preventive measures to improve the city's roads. The Department of Public Works highlights the importance of this program, which aims to seal each asphalt street in Salina at least once every seven years.

    Visit here for more details

    This article has been enhanced with AI assistance. Agree to access AI-generated content by clicking here, or opt for content with less AI influence here.

    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0