Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • Traffic Information

    🚧 Utility Repair Work Prompts Shoulder Closures Near Vineland on Daniel Road and US 50 - Update

    2024-05-07
    https://img.particlenews.com/image.php?url=0Tu6Y1_0srDMVFu00

    The time displayed is local to the original 511 traffic site in Colorado.

    Residents and travelers in the Vineland area should be aware of ongoing utility repair work that has resulted in the closure of both shoulders on a stretch between Daniel Road and US 50. Specifically impacted is the section from Mile Point 0.5 to Mile Point 1, just 1 mile north of Vineland. This closure began today at 8:00 AM MDT and will continue until May 17, 2024, at approximately 5:00 PM MDT.For those planning their travel around this area, note that the full schedule for the maintenance work is as follows:- Starting May 7th from 8:00 AM, the work will progress until May 17th, concluding at 5:00 PM.Commuters are advised to seek alternate routes if possible and to allocate additional travel time to accommodate for any potential delays. Safety measures and traffic signs are expected to be in place for the duration of the repair work.
    This article includes content summarized and organized by AI tools. Learn more.
    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0