Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • Traffic Information

    🚧 Weekend Lane Closure Update on SB I-5 in Bellingham, WA for Concrete Project

    2024-05-16
    https://img.particlenews.com/image.php?url=1XJa2B_0t5YdTrg00

    The time displayed is local to the original X account in Burlington, WA.

    Residents and travelers in the Bellingham area should prepare for a major concrete panel replacement project scheduled for this weekend. A lane closure will take place from 6 a.m. Sunday (5/19) to 6 a.m. Monday (5/20) on the right lane of southbound Interstate 5 between Lakeway Drive (MP 253) and Samish Way (MP 252). The lane reduction allows crews to carry out essential repair work on the interstate and provides time for the new concrete to properly cure. The Samish Way ramp will remain open throughout the duration of the project. While driving through the work zone, please remember that even if crews are not visible, work is still ongoing, and it is crucial to slow down to maintain safety. Motorists should anticipate additional travel time due to the lane closure and plan their routes accordingly.

    This article includes content summarized and organized by AI tools. Learn more.

    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0