Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • Traffic Information

    🚧 Update on Roadwork Affecting Traffic in Lake Village, Newton County, IN

    2024-04-15
    https://img.particlenews.com/image.php?url=30UrMz_0sRwvtD000

    The time displayed is local to the original 511 traffic site in Indiana.

    Residents and motorists in Newton County are advised of ongoing roadwork that commenced on April 15, 2024, at 6:00 AM CDT and will continue until April 18, 2024, around 3:00 PM CDT. During this period, speed restrictions have been imposed and speed limits have been reduced to 5 mph to ensure safety. Notably, the construction work is part of Contract # B-44149/DES# 1700075, and it involves paving for the surface lift between Co Rd. N 75 W and Co Rd. N 150 W, near Lake Village. The roadwork is being conducted one lane at a time, and a flagging operation is in place to assist with traffic flow. Delays can be expected, and drivers are encouraged to exercise patience and follow the guidance of the traffic control personnel on-site. For more information or assistance, the public can reach out to Indot at 855-463-6848. Commuters should plan their travel accordingly to accommodate the construction schedule and heed all signage and reduced speed limits.
    This article includes content summarized and organized by AI tools. Learn more.
    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0