Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • Traffic Information

    🚨 Extended One-Way Traffic Control on SR160 3-Mile Slough Bridge Through July 2024

    2024-05-08
    https://img.particlenews.com/image.php?url=4eEu3E_0st4DpT100

    The time displayed is local to the original X account in 703 B St., Marysville, CA.

    The California Department of Transportation (Caltrans District 3) has issued a traffic alert notifying the public that the 3-Mile Slough bridge on State Route 160 in Sacramento County will have ongoing one-way traffic control until July 2024. The extended control is due to the construction work on a new electrical lift system, which is part of a project aimed at improving the bridge's functionality. Motorists are advised to plan for potential delays and to consider alternate routes when traveling in the area. Updates on the project can be followed through the Caltrans official accounts including Caltrans HQ, Caltrans District 10, and Caltrans District 4. Traffic safety enforcement agencies such as CHP Valley and CHPSouthSac, along with the City of Rio Vista, are also part of the communication network providing information about the bridge's roadwork status.
    This article includes content summarized and organized by AI tools. Learn more.
    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0